On-site railway testing involves verification activities carried out at the customer’s premises when the product, its installation or logistical constraints make this approach worth considering. Feasibility depends on the specific test, the available configuration and site conditions. On-site activities must be planned in coordination with laboratory testing.
For large equipment or systems already connected to an installation, the first step is to determine which tests can provide valid technical evidence in the installed configuration. This assessment forms the basis for defining the test programme, identifying the required resources and establishing which documents must be shared before the testing session.
When to Consider On-site Railway Testing
On-site testing may be considered for large electrical cabinets and racks, integrated systems or equipment whose operation depends on connections and devices within the installation. Transportation difficulties are one factor to assess, alongside the possibility of reproducing the relevant configuration elsewhere.
The decision also requires a clear understanding of the objective: which requirements need to be verified, which functions must be monitored and what evidence must be provided to the customer. On-site testing should be included within this scope from the initial preparation of the test plan.
Which Tests Can Be Performed On-site?
The feasibility of performing tests at the customer’s premises must be assessed on a case-by-case basis. The availability of portable testing equipment, environmental conditions, power supplies, accessibility and test method requirements all contribute to this assessment.
The fact that one test can be performed on-site does not automatically mean that all other activities included in the test plan can be carried out at the same location.
For example, EMC testing also requires consideration of the surrounding electromagnetic environment and equipment connections. When a test method requires conditions that cannot be achieved or controlled at the customer’s site, the relevant activity must be scheduled in a suitable testing environment.
| Aspect | In the Laboratory | At the Customer’s Premises |
|---|---|---|
| Configuration | Test setup prepared to represent the intended application. | Installed configuration and available connections to be verified. |
| Test conditions | Testing environments and equipment selected according to the method. | Site compatibility with the test method must be assessed. |
| Organisation | Samples, accessories and test setups must be prepared. | Site access, local resources and system availability must be agreed upon. |
Laboratory and on-site testing are not automatically equivalent. The test plan must specify where each activity will be performed and how the relevant conditions will be documented.
How to Prepare an On-site Testing Session
Preparation begins with the product documentation. Electrical diagrams, photographs, technical drawings and descriptions of operating modes help identify connection points, auxiliary devices and functions to be monitored. The hardware and software versions involved must also be clearly identified.
Organisational requirements must then be addressed, including available space, site access, power supplies, support personnel and system availability. Any need to shut down parts of the installation or establish a temporary configuration should be discussed before scheduling the testing session.
The agreed test plan links each verification activity to the applicable requirement, equipment configuration and acceptance criteria. It also defines initial and final checks, the responsibilities of each party and the procedures for recording anomalies or deviations.
A preliminary site inspection may be useful when the available documentation is insufficient to clarify site conditions.
How to Organise Witnessed Testing Sessions
When a project includes a witnessed testing session, participants, activities to be observed and documentation to be made available must be agreed upon in advance.
Analytical can also organise testing activities attended by RFI representatives, when required by the project and agreed upon by the parties involved.
The participation of these representatives relates to the specific activity and agreed process. It does not, in itself, constitute general product approval or recognition covering all tests included in the programme.
What Evidence Should Be Collected During Testing?
Test records must allow the activities performed to be reconstructed. Relevant information includes sample identification, equipment configuration, photographs of the test setup, instruments used, test conditions and results.
Any deviations from the test method or agreed plan must be managed and documented, including an assessment of their impact on the validity and usability of the resulting evidence.
Changes made to the product during the testing process must also be traceable. Modifications to wiring, shielding or components require an assessment of whether previously completed tests remain applicable.
Frequently Asked Questions About On-site Railway Testing
- Are on-site tests always accredited?
Accreditation coverage must be verified for each individual test, method and testing location. A laboratory’s accreditation does not automatically extend to every activity performed at the customer’s premises. - Does EN 50155 allow all tests to be performed on-site?
Reference to EN 50155 alone does not establish the feasibility of on-site testing. The standard applies to onboard electronic equipment within its defined scope. The applicable requirements, test methods and actual testing conditions must therefore be assessed for each activity. - Is a complete test plan required to request a feasibility assessment?
An initial assessment can begin with a description of the system and the documentation already available. This preliminary discussion helps identify the information needed to define feasibility and develop the testing programme.
Request an On-site Testing Feasibility Assessment
Analytical assesses which testing activities can be performed at the customer’s premises and how they can be coordinated with laboratory testing. To begin the assessment, provide a description of the product, its installation, the applicable requirements and any access or transportation constraints.
Request a preliminary feasibility assessment for on-site railway testing.
If you are still defining your testing programme, explore how to develop a test plan for railway electronic equipment in our dedicated white paper.